FAIL (the browser should render some flash content, not this).
About Us
What We Do
Experience
News
Careers
Contact Us
  • Detroit, Michigan
  • Design Assist

detroit_opera_house.jpg
                                                            
The following equipment was used to complete this project:
                                                                        
  • Chilled Water
  • Hot Water
  • Air Handling Units
  • Four-Pipe Fan Coil System
  • Indoor air quality supplied by rooftop units with 100% economizers and duct distribution system
  • Perimeter hot water and fin tube radiation
  • Toilet Exhaust